Public Jobs

Bidding Closed
3/21/19 2:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #4 Electrical (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
Bid Package #4 – Electrical
Bids due in 2 days
3/28/19 3:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #18-19 (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
BP 18 – SITE CONCRETE AND FURNISHINGS, BP 19 – GENERAL WORK RESULTS.
Bids due in 2 days
3/28/19 1:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #14-17 (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
BP 14 – PAINTING, BP 15 – ACOUSTICAL CEILINGS, BP 16 – ARCHITECTURAL WOODWORK/CASEWORK, BP 17 – SITE LANDSCAPING/FIELD GRADING.
Bids due today at 3:00pm
3/26/19 3:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #10-13 (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
BP 10 – ROOFING AND SIDING, BP 11 – FRAMING AND DRYWALL, BP 12 – FLOORING AND TILE, BP 13 – KITCHEN EQUIPMENT
Bids due in 3 days
3/29/19 10:00 am
Loon Lake Elementary HVAC Upgrades
ALSC Architects
Loon Lake, WA
The Work consists of: Replacement of HVAC System, Piping and Cooling Tower.
Bidding Closed
3/19/19 3:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #5-9 (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
BP 5 – PLUMBING, BP 6 – HVAC, BP 7 – FIRE SPRINKLER, BP 8 – ELEVATOR, BP 9 – GLASS & GLAZING
Bids due in 2 days
3/28/19 4:00 pm
Amistad Elementary, Project 2 - Kennewick
ALSC Architects
Kennewick, WA
General Description: 1. Amistad Elementary School is located on 930 W 4th Avenue, Kennewick WA. The existing school, new Amistad Elementary – Project 1, and site will remain in use during construction. The new school will be located on the west half of the existing site, and connected to Project 1. 2. Maintain an operational and occupied existing school and site during construction; which includes safety egress, access and utilities. 3. There is limited off-site work anticipated with this project. 4. The work includes civil, landscaping, architectural, structural, mechanical, electrical systems and all necessary and required work to complete the project as described in the contract documents. 5. The site work for this project will be completed in phases to accommodate the District’s continued use of the existing school. The original school will be demolished as part of this project during the last phase.
Bidding Closed
3/12/19 1:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #3 Masonry
Graham Construction & Management, Inc.
Mead, Eastern WA
Bid Package #3 - Masonry
Bidding Closed
3/7/19 3:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #2 Bldg Concrete & Structural Steel
Graham Construction & Management, Inc.
Mead, Eastern WA
BP #2 Building Concrete and Structural Steel
Bidding Closed
2/19/19 3:00 pm
Mead School District - New Five Mile Prairie Middle School - BP #1A & BP #1B (Sub-Bids Graham)
Graham Construction & Management, Inc.
Mead, Eastern WA
BID PACKAGE 1A On-Site Earthwork and Utilities – The work for this package includes all supervision, safety, labor, materials, tools, supplies, and equipment necessary to complete the sitework and utilities per the terms and conditions of this subcontract. This subcontract includes, but is not limited to, Division 00 – Bidding Requirements, Division 01- General Requirements, 311000 – Site Clearing, 312000 – Earthmoving, 331000 – Water Utilities, 333000 Sanitary Sewerage Utilities, 334000 Storm Drainage Utilities. Including 003132 - Geotechnical Engineering Evaluation (dated August 30, 2018 with Addenda 1 and 2). Reference Civil Sheets V-101 through C-705.